The whole construction process will last only four months. The restaurant needs to be ready for the spring. The surrounding streets are narrow, so the construction system is designed with mid-sized components.

We try to reuse as much on-site materials as possible. The excavation soil will be spread all around the site. There is a ceramic floor that will become the foundations drainage system.